Valley Center Road Improvements, Phase 2
Banbury Drive to Cole Grade Road
Update # 22
January 8th-19th, 2007
In December 2005, the County of San Diego Department of Public Works started Phase 2 of this project.
Phase 2 involves the following improvements from 1 mile south of Banbury Drive to Cole Grade Road:
• Widening and realigning the road
• Adding either a landscaped or striped median, bike lanes, graded parkways, and an enhanced pathway
• Adding a concrete sidewalk along portions of the road through town
• Undergrounding overhead utilities
• Installing a new water line
• Installing a new gas line
As the lowest qualified bidder, Archer Western Contractors, Ltd. is the contractor for this $34.1 million project. Phase 2 is anticipated for completion in 2008.
Temporary Traffic Control:
Please observe the posted speed limits to avoid double penalty traffic fines and allow extra time to travel through the construction zone.
One lane traffic control with a flagging operation will be in place periodically from 9am - 3pm M-F. Traffic delays can be expected during these hours.
Daytime Work Hours:
Mon-Fri: 7:00 a.m. to 4:00 p.m.
During the weeks of January 8th and January 15th, the contractor will perform the daytime operations outlined below:
Segment 1: Valley Center Grade to Woods Valley Road
• Continue earthwork
• Clear and prepare area for fill near Ridge Ranch Road
Segment 2: Woods Valley Road to Old Road
• Continue installing underground utility conduits
• Continue storm drain improvements
• Continue installation and testing of water lines
• Continue permanent roadway construction
• Continue earthwork
Segment 3: Old Road to Miller Road
• Continue to cut and build slopes
• Relocate fence
• Continue clearing and grubbing
Segment 4: Miller Road to Cole Grade Road
• Continue installation of irrigation meters
• Continue roadway fill and backfill of structures
• Continue storm drain improvements
Erosion control devices will be continually installed and maintained in each segment.
Thank you for your cooperation and patience as we work to improve your community. If you have any questions, please contact:
Destree Lazo or Leslie Emmanuel
Email: DestreeL@CollaborativeServices.biz
Email: LeslieE@CollaborativeServices.biz
1 Upcoming Construction Activity
3 For More Information
2 Project Description
Questions? Call 1-619-232-2640